Four high-quality apartments in the Delijski Vis neighbourhood — all with underfloor heating, large terrace windows and energy-efficient heat supply via a high-quality heat pump. Move-in ready from mid-2027.

New construction with building technology usually found only in upscale projects in Germany — clean and modern on the outside: white façade, flat black roof, black flat-steel terrace railings.
Central air-to-water heat pump with underfloor heating in every apartment, with individual room control via digital room thermostats in every room — warm, efficient, affordable.
High standard with a generous number of power outlets, network connections and TV distribution in every room.
Electric roller shutters, with floor-to-ceiling triple-glazed windows in living and bedrooms — optionally retrofittable with integrated insect screens.
12 cm of façade insulation which, together with the heat pump and triple-glazed windows, keeps energy costs very low.
Level-access walk-in shower with a high-quality Raindance shower head for comfortable, barrier-free showering.
Electronic door opener with security door, plus additional camera surveillance of the property.
Philips Hue wall lights on each terrace, controllable via app (extension to the whole building is being considered).
On the roughly 550 m² plot, with room for future outdoor landscaping.
Four floor plans — from the ground-floor apartment to the premium rooftop terrace with a view over Niš.
Currently used by the owner. Fit-out will follow after the upper floors — two floor-plan variants are being considered.
Available later View floor plan (PDF)Underfloor heating and plumbing already well advanced. Identical layout to the 2nd floor apartment.
Under completion — until mid-2027 View floor plan (PDF)Large-format tiles, high-quality bathroom fittings (Grohe/Hansgrohe). Identical layout to the 1st floor apartment.
Under completion — until mid-2027 View floor plan (PDF)The most exclusive of the four apartments: a generous rooftop terrace with views across all of Niš.
Under completion — until mid-2027 View floor plan (PDF)A realistic overview of the remaining construction steps.
Shell construction complete, building services in final installation, façade underway.
Screed, tiling, painting, terraces — the 3 upper apartments will be completed.
Renting of the upper apartments begins; the ground-floor apartment will be renovated afterwards.



We will get in touch as soon as the apartments can be viewed.
